DNC Elrick 11/12/24 Results

Results
RouteGadget

Many thanks to Ros for planning and Hugh and David for control collecting/controlling.
No 4 on the long was inspected last night and found to be in the correct place so the legs 3-4-5 have been reinstated in the results and used for RG.

Something to say about this? Leave a reply....